• • 上一篇    下一篇

卫星工程管理的工具——工作分解结构和工作包

杨维垣,魏玫凌   

  1. 中国空间技术研究院 ,中国空间技术研究院
  • 发布日期:1991-02-25

A SATELLITE ENGINEERING MANAGEMENT TOOL-WORK BREAKDOWN STRUCTURE AND WORK PACKAGE

Yang Weiyuan Wei Meiling (Chinese Academy of Space Technology)   

  • Published:1991-02-25

摘要: 介绍一种有用的卫星工程管理工具,即工作分解结构和工作包。详细阐述了简要、合同和工程项目工作分解结构的用途和建立方法。对工作包、产品树、产品矩阵、工作说明和技术规范也有详细的描述,并通过实例说明了编制方法。文章最后简要说明了如何在卫星工程管理中使用这一工具。

关键词: 人造卫星, 工程管理, 工作分解结构, 工作包

Abstract: A useful tool for satellite engineering management,i.e.the work breakdown structure(WBS)and work package,is presented in this paper. It describes in detail the usage and establishment methodology for sunmma- ry WBS,contract WBS and engineering project WBS.In addition it also explains the work package,the product tree,the product matrix,the state- ment of work and technical specification through some practical examples. At the end of this paper,the application of this tool in the satellite engine- ering management is briefly discussed.