• • Previous Articles    

Priority Design Method Analysis for TT&C Resource

Ran Chengxin Wang Huilin Xiong Gangyao (College of Information System and Management, National University of Defense Technology,Changsha 410073)   

  • Online:2009-06-25

Abstract: It is an important and key problem to set priority on TT&C resource during the satellite TT&C scheduling process.Based on the engineering analysis of resource requirements, nine priority factors were studied,and the factor's quantificational description model was also presented.The reformative TOPSIS model for priority calculation was carried out and its calculation steps were given.An example was given to show the validation of this model.The result is expected to be useful in scheduling algorithm research.

Key words: Technique for order preference by similarity to ideal solution, Effect factor Priority, Measurement and control system, Space engineer