Chinese Space Science and Technology
• • Previous Articles Next Articles
Zhu Renzhang (Beijing Institute of Spacecraft System Engineering)
Online:
Abstract: t By means of the demonstration of tether deployment fromthe geostationary orbit,the selection of the parameters in the length ratecontrol is further explained.An estimation of the tether tension is given.
Zhu Renzhang (Beijing Institute of Spacecraft System Engineering). TETHER DEPLOYMENT UNDER RATE CONTROL[J]. Chinese Space Science and Technology.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: https://journal26.magtechjournal.com/kjkxjs/EN/
https://journal26.magtechjournal.com/kjkxjs/EN/Y1991/V11/I04/50