SpacecraftTT&CSchedulingModelsandAlgorithms

XUXiaohui1,HUShaolin1,2,GUOXiaohong1,ZHAOZongyu1   

  1. (1Xi′anSatelliteControlCenter,Xi′an710043)(2Xi′anUniversityofTechnology,Xi′an710043)
  • Received:2013-07-22 Revised:2013-09-23 Published:2014-06-25 Online:2014-06-25

Abstract: ThemainobjectiveofspacecraftTT&C(Track,Telemetry&Control)  resourcesschedulingproblemistomaximizethespacecrafttasksthroughTT&Cresourcesallocationwithsomeschedulingmethods.Atimewindow-orientedmodelwasproposedinreferencetothetaskorientedmodels.Furthermore,thebranchandboundalgorithmofthemodelanditscomplexityanalysisweregiven.Finally,thevalidityandpracticabilityofthealgorithmswereshowedbysimulation.

Key words: Branchandbound, Timewindow, Resourcesscheduling, Tracktelemetry&control, Spacecraft