[1] |
LIU Wei, ZHENG Runze, ZHANG Lei, GAO Zihe, TAO Ying, CUI Kaixin.
Research of dynamic beam resource scheduling of LEO constellation based on A2C algorithm
[J]. Chinese Space Science and Technology, 2023, 43(3): 123-133.
|
[2] |
ZHANG Yaoyuan, YANG Hongwei, YUAN Ronggang, LIANG Yijin, LI Shuang.
Satellite multi-object repetitive observation mission planning based on hierarchical clustering
[J]. Chinese Space Science and Technology, 2023, 43(1): 29-43.
|
[3] |
LI Changde, XU Wei, XU Liang, WANG Yan.
Multi-satellite TT&C scheduling method based on DNN
[J]. Chinese Space Science and Technology, 2022, 42(1): 65-72.
|
[4] |
FAN Yu, LIU Yingying, ZHOU Jun.
An improved adaptive genetic algorithm for multi-satellite area observation scheduling
[J]. Chinese Space Science and Technology, 2021, 41(1): 38-47.
|
[5] |
WANG Luqi, LIU Bingyi, GUO Wei, ZHU Weige.
Task scheduling of lunar relay satellites for minimal data loss
[J]. Chinese Space Science and Technology, 2020, 40(1): 60-.
|
[6] |
WANG Zhi, DENG Changlin, GUO Wei, ZHU Weige.
Research on multi-source information fusion task scheduling of space-based information port#br#
[J]. Chinese Space Science and Technology, 2018, 38(3): 76-84.
|
[7] |
ZHU Xiao-Yu, QIAO Bing, ZHANG Qing-Zhan, JIN Yong-Qiang, TAN Ying-Long.
Missionschedulingformultiplespacecraftrefuelingbasedonspacefuelstationincircularorbits
[J]. Chinese Space Science and Technology, 2017, 37(2): 35-43.
|
[8] |
ZHAO Ping, CHEN Zhi-Ming.
Anadaptedgeneticalgorithmappliedtosatelliteautonomoustaskscheduling
[J]. Chinese Space Science and Technology, 2016, 36(6): 47-54.
|
[9] |
ZHAN Pan-Pan, GUO Jian, LIU Xin.
Realtimeschedulingbasedontimetriggered1553Bbus
[J]. Chinese Space Science and Technology, 2016, 36(6): 77-82.
|
[10] |
YU Guang-Liang, YANG Meng-Fei, XU Jian, JIANG Hong.
Worstcaseresponsetimeanalysisofmultilevelinterruptsystems
[J]. Chinese Space Science and Technology, 2016, 36(2): 28-.
|
[11] |
WANG Zhi-Lin, LI Xin-Ming.
ResourcesSchedulingOptimizationProblemoftheTDRSS
[J]. Chinese Space Science and Technology, 2015, 35(1): 36-42.
|
[12] |
XU Xiao-Hui, HU Shao-Lin, GUO Xiao-Hong, ZHAO Zong-Yu.
SpacecraftTT&CSchedulingModelsandAlgorithms
[J]. Chinese Space Science and Technology, 2014, 34(3): 32-37.
|
[13] |
WANG Zhi-Yong, WANG Yong-Qiang, WANG Jun, LI Jun, WU Qiu-Yun.
NewMultisatelliteSchedulingMethod
[J]. Chinese Space Science and Technology, 2012, 32(1): 8-14.
|
[14] |
JING Fei, WANG Jun, LI Jun, JING Ning.
Scheduling for Image Satellite Oriented Ocean Survey
[J]. Chinese Space Science and Technology, 2011, 31(2): 72-78.
|
[15] |
Yao Min Zhao Min(College of Automation Engineering,Nanjing University of Aeronautics and Astronautics,Nanjing 210016).
Task Scheduling Optimization Design for Micro-satellite Based on Load Balancing
[J]. Chinese Space Science and Technology, 2009, 29(04): 77-83.
|